Name:B SUDHEER KUMAR REDDY
Designation: Assistant Professor (Ad Hoc)
Qualification:: M.Tech
Experience:6 years 4 months
Specialization:Construction planning & project management
Areas of Interest: Construction planning & project management
Address: D.NO: 2-2063/5-5,Chenna reddy colony,Near APS RTC bus stand,Piler, Chittoor (Dt),Andhra Pradesh.
Email-Id: nbsudheerkumar@gmail.com
Mobile-No: +91 9110326046 (P)
Career Objective:To be a part of your esteemed Institution, so that I can contribute in fulfilling the dreams of the institution along with my personal development.
Educational Profile:
COURSE | INSTITUTION | YEAR | % OF MARKS |
---|---|---|---|
M.tech(Construction planning and Management),JNTU Anantapuramu. | Shri Shidi Sai Institute of Science and Engineering, Anantapuramu. | 2014-2016 | 75 |
B.tech(Civil Engineering),JNTU Anantapuramu. | Chiranjeevi Reddy Institute of Engineering and Technology,Anantapuramu. | 2009-2013 | 67.79 |
Intermediate, Board of Intermediate Education,A.P | Ranganahta junior college,Tirupati. | 2007-2009 | 84.3 |
SSC, Board of Secondary Education, A.P | Sri Chaitanya Children’s Academy, Tirupati. | 2006-2007 | 87 |
Technical skills:
- Primavera P6
- Microsoft Projects
Experience:
Working as Assistant Professor in the Department of Civil Engineering at JNTUA College of Engineering Kalikiri from July 2017 to till date (6 years 4 months)
B.tech Project:
- Name :ASSESSMENT OF COMPRESSIVE STRENGTH OF LIMESTONE AGGREGATE CONCRETE WITH CRIMPLE STEEL FIBRE.
- Duration : 4 months.
- Team size : 4 members.
- Role : Team leader.
Description:
The main objective of this project is to find the efficacy of lime stone aggregate with crimpled fibre for civil constructions by which natural materials can be preserved for future generations. The scope of project is focused on the use of coarse aggregate using lime stone material. In construction industries, the use of aggregates is the most importance material in composition of concrete. Places having granite aggregate should have no problem in construction projects, but for places where the other type of aggregate is also available on par with granite, to curb the use of excessive granite material, in other words, to preserve the natural good material (granite) for future generation, it is necessary to use other available material in to some extent.
In general granite aggregate is commonly used in industrial construction. Though IS 383-1970 code specifies the use of limestone and other aggregate for construction works, but it was very meager in reality. In this regard a ray of light was focused on use of lime stone aggregate for slabs elements.
Little research has been carried out on the flexural behavior of Lime stone Concrete (LA) with the use of crimple fiber, to know the behavior of compressive and split tensile strength of lime stone aggregate, flexural behavior of lime stone aggregate concrete and to know the failure modes under flexural loading.
Total 30 beam specimens are prepared. Six beams with natural granite aggregate and other 24 beams are prepared with lime stone aggregate as replacement of granite aggregate in proportion 25, 50, 75 and 100% and included of fibers with 1 and 2% of volume.
Based on the availability of equipment in the laboratory experimental work was conducted on cube so that it leads to evaluate compression.
M.tech Project:
- Name : SMART CONSTRUCTION PROJECT MANAGEMENT
- Duration : 6 months.
Description:
Project management process is revolutionized by the Invent of project management software. Computerized planning and scheduling renders efficient and probable plan for enormous projects. The key features of any project management software includes producing and manipulating a schedule, resource planning, possible delay estimates,allocation of budgets and communication within the team
The management of construction projects requires knowledge of modern management as well as an understanding of the design and construction process. Construction projects have a specific set of objectives and constraints such as a required time frame for completion. While the relevant technology, institutional arrangements or processes will differ, the management of such projects has much in common with the management of similar types of projects in other specialty or technology domains such as aerospace, pharmaceutical and energy developments.
Many Internet-based information services for the construction industry provide a capability to build one's own free limited web page residing on the provider's server. However, to implement Internet-based applications in construction project activities successfully, the applications should be acceptable in the construction environment and the utility assessment of such applications is needed. The assessment will determine whether the Internet-based applications in construction industry can perform as intended and provide an optimal configuration of Internet-based services for supporting construction project activities. Procurement management and scheduling are the two basic needs catered by the project management software.
The delay in the construction schedule can be further decreased with the adoption of e-commerce. The security and negotiation through the electronic agent is an optimized solution to increase the efficiency of the construction.
Achievements:
- Participated in technical quiz competition held at JNTUA RACE-2K11 and received merit.
Extra-curricular Activities:
- Participated in various social activities as a NSS volunteer.
- Participated in a three day Entrepreneurship awareness camp conducted by APITCO.
- Organized various technical events in National level technical symposium conducted in our college.
Personal Skills:
- Sincere and hard working
- Positive thinking
Personal Profile:
- Name : B.SUDHEER KUMAR REDDY
- Father’s Name : B. Narasimha Reddy
- Mother’s Name : B. Bhagyalakshmi
- Sex : Male
- Date of Birth : 14th March, 1991
- Languages Known :Telugu, English & Hindi
- Permanent Address : D.NO: 2-2063/5-5,Chenna reddy colony,Near APS RTC bus stand,Piler, Chittoor (Dt),Andhra Pradesh.